Flag of OmanOman
Flag of ItalyItaly

WATAD insulated panel building system in Oman

Panels made with Italian Emmedue technology at the WATAD factory in Khazaen Economic City, Barka, Oman. The system combines an EPS insulating core, steel mesh and through-panel connectors, with concrete layers applied on site to the project drawings.

EPSSteelConcrete
Al Ansab villa in Oman — Oman
WATAD applications in Oman
From a panel to the space you live in

Al Oula Development & Investment

The team behind WATAD

Al Oula Development & Investment brings together investment, property development, engineering and construction management expertise. Through WATAD, Al Oula brings panel manufacturing and project needs together in Oman.

Investment & development

Experience in appraisals and property development.

Engineering & construction management

A project perspective that connects requirements with construction.

Advanced building technology

WATAD combines Italian Emmedue technology with manufacturing in Oman.

Discuss your project
Al Oula Development & Investment
50+

years of combined experience in investment, development, engineering and construction management

Explore the WATAD factory

WATAD factory · Khazaen · Barka · Oman

Manufactured in Oman. Prepared for your project.

At the WATAD factory in Khazaen Economic City, Barka, Italian Emmedue technology becomes panels manufactured to project specifications, ready for site assembly and concrete application.

Emmedue panel production hall with manufacturing lines and machinery
Emmedue panel manufacturing technology

Production technology reference photos from Emmedue

  1. 01

    Shape the insulating core

    EPS panels cut to the required dimensions.

  2. 02

    Prepare the steel mesh

    Welded mesh around the insulating core.

  3. 03

    Assemble the panel

    Mesh and insulation connected for site assembly.

Discuss supply for your project

What do you want to build?

Start with what matters to you. Explore the details, applications and questions that help you make a sound decision.

Architectural concept of villa, residential and hospitality applications
Architectural concept — illustration

Italian expertise. Manufacturing in Oman.

WATAD brings the Italian Emmedue panel technology to Oman through Al Oula Development & Investment. Discuss supply and your project requirements with the team.

Concept material study in an engineering studio
Architectural concept — illustration
Flag of ItalyItaly

Emmedue

Panel technology

mdue.it
WATAD
Flag of OmanOman

Manufacturing & supply in Oman

Discuss your project

Performance begins with the layers

A lightweight panel during preparation. A composite wall after installation. Explore how the insulation, mesh, connectors and concrete work together.

Illustrative study of the system layers and elements
System illustration
  1. 1

    EPS insulating core

    Expanded polystyrene within the panel; its thickness and properties follow the design.

  2. 2

    Galvanised steel mesh

    Mesh on both faces integrates with the concrete layers after application.

  3. 3

    Through-panel connectors

    Wires connect the mesh through the core, following the specified element details.

  4. 4

    Concrete layers & finish

    Applied on site. Reinforcement, thickness, curing and finish depend on the project.

Watch the system tests

Elements that work with your design

Walls, floors and stairs in one system family. Structural design determines the right element, reinforcement and connection details.

Single wall panel

Single wall panel

Element and layer details

See the system become a building

Watch the Emmedue video to explore the single panel and its installation, from preparing and connecting panels to applying concrete. Project drawings and the approved method statement determine the installation details.

The Emmedue Single Panel · Explore the system and its installation

Watch on YouTube

Comfort is built into the wall

The wall is part of a complete comfort strategy. Insulation, detailing, windows, the roof and air conditioning work together to shape the indoor environment.

Concept living space opening onto a shaded courtyard
Architectural concept — illustration

Thermal insulation for your design

Wall U-value as low as

U = 0.169 W/m²K

About 92.7% less wall heat transfer — indicative calculation versus a 220 mm finished hollow-block reference.

PST200 partition / curtain wall; 25 cm finished thickness, 20 cm EPS at 25 kg/m³. Calculated value.

Floor U-value as low as

U = 0.159 W/m²K

PSSG240; 24 cm EPS pot height at 15 kg/m³, with a 4 cm EPS base plate, 4 cm concrete and 2 cm plaster. Calculated value.

For the PSM140 single wall: calculated U = 0.240 W/m²K, with 21 cm finished thickness and EPS density of 25 kg/m³. About 89.6% less wall heat transfer — indicative calculation versus a 220 mm finished hollow-block reference.

Comfort you can hear

Reported sound reduction

45 dB(A)

PSM90 specimen, 180 mm finished thickness; gross reduction measured at IDIEM, University of Chile, 1998. The result applies to the tested specimen.

Façade sound insulation with an internal lining

51 dB · D₂m,nT,w

In-situ result for PSME 80 with internal insulated plasterboard, to UNI EN ISO 140-5 and 717-1. Report 41506, November 2005. This is a different acoustic index from the PSM90 result above and applies to the tested assembly.

Façade acoustics — PSME 80 (2005) PDF · 0.02 MB

Acoustic performance depends on the wall assembly, joints and openings. Request a report matching your project assembly.

Consider the whole building

Roof, windows, shading, air conditioning and workmanship complete the choice. Discuss them as one coordinated design.

24-hour artificial rainfall test

No damp appeared on the unexposed face of a 130 mm finished wall with a 40 mm EPS core. Water flow: 35 L/h; overpressure: 6 mm water. IDIEM report 209.637, July 1994; the result is specific to that specimen and test conditions.

Artificial rainfall test (1994) PDF · 0.04 MB

Source: Emmedue Panel Specifications, Rev. 05, 01/14, printed pages 8, 9 and 13; and the IDIEM acoustic report dated 21 January 1998. Values apply to the stated assemblies; a lower U-value means less heat transfer. Whole-building results depend on joints, openings and installation.

Specifications and performance references

International comparison reference: 200 mm hollow concrete block + 10 mm cement plaster on each face = 220 mm finished. The uninsulated wall performance is calculated from layer properties published by Bahrain’s Electricity and Water Authority.

R = 0.059 + 0.226 + 0.121 + (2 × 0.010 ÷ 0.75) = 0.4327 m²K/W
U = 1 ÷ R ≈ 2.31 W/m²K

Reduction = (1 − WATAD U ÷ reference U) × 100. An indicative calculation for the stated wall assemblies at equal area and temperature difference, rather than a matched laboratory comparison. The percentage applies to wall heat transfer only, not cooling bills or room-temperature reduction.

Acoustic performance: 45 dB(A) measured gross reduction for the 180 mm finished PSM90 specimen. Installed performance depends on the wall assembly, joints and openings.

Give your design room to take shape

From straight lines to curves and domes. Discuss design possibilities early so your architectural idea connects with buildable details.

CurvesDomesOpeningsStairs
View reference
Alian Chalet in Saudi Arabia — Saudi Arabia
Saudi Arabia · International technology reference

Ask about performance. See the evidence.

Your decision needs evidence for the assembly being used. Request technical reports and test conditions, then discuss their relevance with your project consultant.

See tests carried out on Emmedue panels around the world.

Watch the full film on YouTube

Seismic tests

ENEA reported no damage to a two-level model tested at input PGA up to 0.45g. The model was 3.40 m wide and 5.74 m high, with 150 mm walls; tests in 2008, report in 2009. The result applies to the tested model, loading and connections, not a Richter-magnitude rating.

Watch seismic tests

Fire resistance — 120 minutes

Report CSI1058RF classified the non-loadbearing PSME 80 partition, 150 mm finished thickness, as REI 120 and RE 180 under the Italian provisions stated in the report. Tested May 2003. The original classification notation is retained; this is specific to the tested partition, not a loadbearing wall or every WATAD assembly.

Fire resistance — PSME 80 (2003) PDF · 1.53 MB

Reports concern the Emmedue assemblies identified in each source. The project consultant should check materials, thicknesses, reinforcement, connections, loads and local approval requirements before applying the results.

Request technical information

Compare your project on clear terms

Cost goes beyond the panel price. Compare scope, labour, programme and finishes on the same basis, then assess the choice with your team.

Project planning concept with architectural model and material samples
Architectural concept — illustration

Time, cost and comfort

60% less construction time.

From 100 reference time units for conventional construction to 40 with WATAD. Discuss the programme and scope with our team to estimate your project duration.

Programme index: conventional = 100; WATAD = 40.

Cost savings up to

25%

Depending on specifications and project size.

Reported sound reduction

45dB(A)

PSM90 specimen, 180 mm finished thickness; gross reduction measured at IDIEM, University of Chile, 1998. The result applies to the tested specimen.

Wall U-value as low as

0.169W/m²K

About 92.7% less wall heat transfer — indicative calculation versus a 220 mm finished hollow-block reference.

PST200 partition / curtain wall; 25 cm finished thickness, 20 cm EPS at 25 kg/m³. Calculated value.

Floor U-value as low as

0.159W/m²K

PSSG240; 24 cm EPS pot height at 15 kg/m³, with a 4 cm EPS base plate, 4 cm concrete and 2 cm plaster. Calculated value.

Time and cost comparison by Al Oula. Duration depends on the project programme and scope; cost savings depend on specifications and project size. Source: Emmedue Panel Specifications, Rev. 05, 01/14, printed pages 8, 9 and 13; and the IDIEM acoustic report dated 21 January 1998. Values apply to the stated assemblies; a lower U-value means less heat transfer. Whole-building results depend on joints, openings and installation. Insulation comparison basis and sources

CompareWhat should it include?
MaterialsPanels, reinforcement, concrete, transport and storage.
Site workAssembly, support, services, finishes and inspections.
ProgrammeSupply, crew coordination, curing and handover.
OperationEnvelope design, air conditioning, maintenance and building use.
Request a comparison for your project scope

See the system in Oman

From panel installation to completed spaces. Explore WATAD applications at different stages in Oman.

Applications across borders

Emmedue system references from around the world, spanning hospitality, residential and commercial buildings. Explore the range of applications and architectural forms.

Approximate map of the eighteen countries represented in the photo library

International technology reference · Emmedue

Design today with tomorrow in mind

Consider insulation, material use and site detailing early. Environmental outcomes depend on the design, construction and operation of the whole building.

  • Insulation at design stage

    Connect envelope choices to building calculations and use conditions.

  • Material & site coordination

    Review quantities, cutting, storage and work routes.

  • Measure the outcome

    Assessment or certification relates to the building and its review; it does not follow automatically from one material.

Expected structural lifespan: more than 50 years

Emmedue states an expected structural lifespan of more than 50 years, provided design, construction and maintenance follow applicable standards and system specifications. Manufacturer statement dated 10 November 2025; this is not a 50-year warranty or an independent test result.

Manufacturer’s structural-lifespan statement (2025) PDF · 0.44 MB
Illustrative study of the system layers and elements
System illustration

Start with your project’s questions

Tell us the location, building use, available drawings and scope. These details start a practical discussion about your project needs.

Residential project concept in an Omani setting
Architectural concept — illustration
1

Define the project

Location, use and required scope.

2

Gather what you have

Drawings, details and programme.

3

Start the discussion

Email your brief to Al Oula.

What is the WATAD building system?

WATAD is a panel building system with an EPS insulating core, steel mesh and through-panel connectors. Panels are assembled on site and completed with concrete layers to the project drawings.

Where are WATAD panels manufactured?

WATAD panels use Italian Emmedue technology and are manufactured at the Al Oula Development & Investment factory in Khazaen Economic City, Barka, Oman.

Will the system suit my project?

Start with the location, use, drawings, loads and local requirements. The team and consultant review the intended application and required details.

Can I vary the architectural form?

The family includes curved walls, floors and stairs. Review the concept alongside structural details, openings and connections before construction.

What should a cost comparison include?

Define supply, transport, assembly, concrete, reinforcement, services, finishes, support and programme. Compare equivalent scopes rather than individual material prices.

How do I assess thermal or acoustic performance?

Request the test report and the assembly it covers, then review its relevance to your project. Windows, the roof, details and workmanship affect the whole-building result.

What information should I send first?

Send the location, building use, available drawings, required scope and proposed programme to the team’s official email.

Discuss your project
Al Oula Development & InvestmentWATAD وتد

Let’s discuss your project

Al Oula Development & Investment • WATAD system

Oman

Email the teaminfo@aloulaidc.omBack to start
Scan to open the presentationScan to open the presentation